We can help you in Świecko, Poland

80 000 m² of possible storage, logistics or production space.

What sets this warehouse apart is its flexibility, allowing customization to meet your specific requirements. As each unit is built-to-suit, we ensure the feasibility of your specific requests in dialogue with the construction partners.

The standerd building height of 14 meters can be increased up to 30 meters. This flexibility in height, combined with a 7-ton floor load capacity, provides ample space for accomodating production machinery and high stacking storage systems.

Quick overview

built-to-suit

80 000m²

SEZ

As each unit, each approx. 10 000m² is custom-built, we ensure the feasibility of your specific requests.

The overall construction 80 000m² and is divided in 8 different plots, each approx. 10 000m²

The project is located in a Special Economic Zone. SEZ is a designated area offering tax incentives and reduced regulations for business investments

14m > 30m

7-ton

BREEAM

The standard building height of 14 meters provides space for production machinery and high stacking storage systems, with the option to extend up to 30 meters.

The 7-ton floor load capacity means it’s equiped for heavy equipment handling and high-density storage and ensures a long-term durability.

The overall project has a BREEAM ‘very good’ certification. However, if you choose to include office space in your unit, it can be upgraded to a BREEAM ‘Excellent’ rating.

Located on the German-Polish border

The city of Świecko is no stranger to international truckers as it is just off the E30 motorway. This European route stretches all the way from Ireland to Eastern Europe 

Świecko is located on the German-Polish border, close to cities such as Poznań, Berlin and Frankfurt am der Oder. This makes Gateway A2 the perfect hub for transfer or storage infrastructure, as trucks can easily access the site via the E30.

Different construction phases

The entire construction is divided into 8 units, each approximately 10 000m². The standard building height per unit is 14 meters, with the option to expand each unit to a height of 30 meters.

Phase 1, the construction of Unit A, was finished in february 2025. This contains roadworks, the car park and the installation of the utilities for rainwater management, gas, electricity and sprinklers.

Work in progress



About Storage EU

Behind the Gateway A2 project is a strong Belgian investor and developer group called Storage EU, which includes Heem Invest, Captuur and Real United. Storage EU holds full ownership of the plot and has extensive international experience in industrial construction.

Heem Invest

Captuur

Real United

As experts in the construction and real estate sector, Heem Invest supports and guides projects and their partners.

CAPTUUR is an investment partner that focuses on real estate, hotels and private equity

Real United provides support services to a collective of businesses across various sectors, including retail, staffing, wholesale, production, and real estate.

logo heeminvest wit
Captuur_Logo_WHITE_Tekengebied 1 copy 15
Logo-social_Tekengebied+1-1920w

Visit website


Visit website


Visit website

Register for more
information